Home/Manufacturing & Quality
ORDER EXECUTION

BUILD IT RIGHT.
VERIFY IT BEFORE PACKING.

WCAGO separates manufacturing execution from finished-product verification. Manufacturing Control keeps the approved order visible during production. Quality Control begins after production completion and verifies the finished equipment before packing approval.

01CONFIRM THE ORDER BASIS
02FOLLOW MANUFACTURING
03VERIFY FINISHED EQUIPMENT
WCAGO manufacturing control
MANUFACTURING CONTROLWAS THE ORDER BUILT AS CONFIRMED?
WCAGO quality control
QUALITY CONTROLIS THE FINISHED EQUIPMENT ACCEPTABLE FOR PACKING?
ONE ORDER / TWO RESPONSIBILITIES

PRODUCTION EXECUTION
IS NOT THE SAME AS QC.

Manufacturing Control follows the approved order while it is being produced: model, quantity, finish, OEM requirements, production progress and completion.

Quality Control starts after the finished-unit stage. It reviews the actual equipment against the agreed QC basis before packing and dispatch preparation.

MANUFACTURING CONTROL

KEEP THE APPROVED ORDER
VISIBLE DURING PRODUCTION.

The factory work starts after the order is confirmed. WCAGO follows the manufacturing execution so important requirements do not disappear between quotation, OEM confirmation and finished-unit completion.

01

ORDER BASIS CONFIRMATION

Model, quantity, finish, branding, selected configuration and other order-specific requirements.

02

PRODUCTION PREPARATION

Frames, components, finishes and order-specific materials move into the manufacturing plan.

03

ASSEMBLY CONTROL

Follow assembly progress rather than waiting until the order is completely finished.

04

PROGRESS & EXCEPTIONS

Raise material changes or production issues that may affect the confirmed order.

05

PRODUCTION COMPLETION

Finished units are handed over to Quality Control for verification.

VIEW FULL MANUFACTURING PAGE →
WCAGO production line
WCAGO assembly WCAGO final assembly
01PRODUCTION COMPLETEManufacturing Control hands over completed units.
→
02QUALITY INSPECTIONQC checks the finished equipment against the agreed basis.
→
03APPROVED FOR PACKINGOnly approved units move into packing preparation.
WCAGO finished equipment quality inspection
WCAGO detail inspection WCAGO pre-packing verification
QUALITY CONTROL

VERIFY THE FINISHED UNIT
BEFORE PACKING.

Production completion does not automatically mean shipment approval. QC verifies finished-product condition according to the actual model, order configuration and buyer-specific requirements.

01

APPEARANCE & FINISH

Check finished appearance, surface condition and visible issues.

02

ASSEMBLY VERIFICATION

Review the finished assembly state and installed components.

03

ADJUSTMENT & FUNCTION

Check relevant adjustment points and basic operation where applicable.

04

ORDER-SPECIFIC DETAILS

Verify confirmed branding, labels, color or selected configuration items.

05

CORRECTION & FINAL APPROVAL

If an issue is found, correct or clarify it before packing approval.

VIEW FULL QUALITY CONTROL PAGE →
CLEAR RESPONSIBILITY

TWO CONTROLS.
TWO DIFFERENT QUESTIONS.

Keeping the roles separate prevents duplicated content and makes it easier for professional buyers to understand how the order is managed.

MANUFACTURING CONTROL

WAS THE CONFIRMED ORDER MANUFACTURED AS INTENDED?

  • Model & quantity
  • Finish / color / OEM basis
  • Production preparation
  • Assembly progress
  • Exceptions / changes
  • Production completion
QUALITY CONTROL

IS THE FINISHED EQUIPMENT ACCEPTABLE FOR PACKING?

  • Appearance & finish
  • Assembly condition
  • Adjustment points
  • Basic operation
  • Order-specific details
  • Final approval
ORDER EXECUTION

DEFINE THE REQUIREMENT
BEFORE PRODUCTION STARTS.

Send the model, quantity, destination and any OEM or buyer-specific QC requirements. WCAGO can align the manufacturing basis and inspection scope before the order moves forward.